TCN 132/33 kV Substation Upgrade
A critical grid infrastructural upgrade delivered under live-substation operating parameters to secure robust power supply for Abuja.
Identifying critical risks and system bottlenecks.
The aging 132/33 kV substation at Abuja was suffering from thermal overhead limitations, outdated mechanical protection relays, and non-existent telemetry integration, resulting in frequent supply trips and risk to transmission assets.
Delivering precision engineering and tested technology.
Stephenson Brothers Limited (SBL) designed and executed a turnkey replacement program. We supplied and installed 2 x 60 MVA IMEFY power transformers, fully modernised the protection bays with high-speed numeric protection relays, and deployed a modern SCADA system for real-time diagnostics.
Successful commissioning and guaranteed performance.
Completed 2 weeks ahead of schedule with zero lost-time incidents (LTI). The substation achieved immediate stability, registering 99.6% post-upgrade technical availability.
Project execution boundaries.
- Substation design and electrical layout engineering
- Decommissioning of legacy oil transformers
- Installation & testing of 2 x 60 MVA power transformers
- Protection panel retrofitting with Numeric relays
- SCADA gateway integration with National Control Center
- SAT (Site Acceptance Testing)
Certified technology.
- IMEFY Power Transformers
- Nissin Electric MV Switchgear Panels
- ABB Protection Relays
- SBL SCADA Telemetry Gateway
Visual verification of SBL execution.
Have a project that needs the right engineering partner?
Talk to Stephenson Brothers Limited about your next power, industrial, engineering or safety project.
Explore other SBL installations.