Industrial Grid Automation Programme

Client: Confidential Manufacturing Client  |  Location: Port Harcourt, Nigeria  |  Year: 2022

Turnkey MV switchgear replacement and high-speed PLC automation designed for a critical manufacturing facility working under tight shutdown limits.

The Challenge

Identifying critical risks and system bottlenecks.

A massive manufacturing facility suffered from erratic power transfer between grid and on-site gas turbines, causing frequent plant-wide shutdown cycles. Retrofitting needed to happen within a strict 30-hour facility shutdown window.

Our Solution

Delivering precision engineering and tested technology.

SBL pre-engineered and factory-tested a complete replacement of 12 MV switchgear panels and integrated a high-speed PLC-based load shedding and auto-transfer scheme. The site installation was executed in shifts under continuous supervision.

The Outcome

Successful commissioning and guaranteed performance.

Successfully commissioned the complete automation suite within 28 hours, 2 hours ahead of the facility window. Plant uptime increased by 14% within the first quarter.

30 Hr Maximum allowed shutdown
12 MV Switchgear panels replaced
+14% Immediate manufacturing uptime gain
24/7 SBL On-site SLA support
Scope of Work

Project execution boundaries.

  • Pre-commissioning factory acceptance testing (FAT)
  • Fast-track decommissioning of old switchboards
  • Structural civil preparation inside MV room
  • PLC logic configuration for high-speed load shedding
  • Automatic transfer switch (ATS) testing
Equipment & Systems Supplied

Certified technology.

  • Nissin Electric MV Metal-Clad Switchgear
  • Schneider PLC Automation Controllers
  • SBL Custom ATS Panels

Have a project that needs the right engineering partner?

Talk to Stephenson Brothers Limited about your next power, industrial, engineering or safety project.

More Case Studies

Explore other SBL installations.

Request Engineering Quote

Inquiry Submitted

Your quote request has been forwarded to our technical team.

Project Overview

Technical Specifications

Analyzing structure specifications...

Division Overview

Solving Industrial Problems

Division solutions content...

Key Partnerships: IMEFY, Nissin Electric