Federal HQ FireKing Rollout
A complete security asset rollout featuring professional UL-classified FireKing cabinets and safes across a major national department headquarters.
Identifying critical risks and system bottlenecks.
The agency required robust, tested defense parameters for physical archives, strategic files, and critical magnetic media storage against fire, impact, and unauthorized access across an 11-story building.
Delivering precision engineering and tested technology.
SBL designed the spatial deployment plans and oversaw the logistics and technical anchoring of over 340 specialized FireKing units. These units offer up to 4 hours of strict UL classification protection.
Successful commissioning and guaranteed performance.
Delivered and properly installed all units in 6 weeks with minimal disruption to the agency's ongoing daily civil operations.
Project execution boundaries.
- Structural floor loading assessment
- Anchoring and placement engineering drawings
- Multi-unit site logistics and positioning
- Seismic anchoring and security lock calibrations
Certified technology.
- FireKing UL-Classified Fire Safes
- FireKing Impact-Resistant Cabinets
- SBL Media Storage Vault Systems
Visual verification of SBL execution.
Have a project that needs the right engineering partner?
Talk to Stephenson Brothers Limited about your next power, industrial, engineering or safety project.
Explore other SBL installations.
Stephenson Brothers Limited © Copyright 2026 - All Rights Reserved